Heartlands Hospital

Heartlands Hospital
Completion:
2023
Location:
Birmingham
Client:
Heartlands Hospital
Solutions:
Develop Controls Logic, Commissioning, Remote Monitoring, Data Acquisition & Performance Reporting, Energy Centre Controls
Services:
Controls, Commissioning & Remote Monitoring
Sectors:
Building Services

The project has been designed to provide heat to the hospital without the need of the existing boilers to operate as the primary heat source. 2 X Air source heat pumps X 400kW, 1 X 960kW Water source heat pump and 1 X Combined Heat and Power(CHP) unit have been installed as the heat to the hospital.  The CHP will operate in parallel with the boilers delivering heat to the hospital whilst providing the base electrical load.

Link Energy developed the control logic, system integration and commissioning, combining Air source Heat Pumps (ASHP) 2 X 400kW, Water Source Heat pumps (WSHP) 1 X 960kW and a Combined Heat & Power (CHP) unit providing Low Temperature Hot Water (LTHW) to the hospital.  Link has also installed a full remote monitoring and data acquisition package to enable remote plant operation, system monitoring and energy management for the end client.

Recent Case Studies

Banbury New Futures
Banbury New Futures
Completion:
July 2022
Location:
Banbury
Client:
RMS
Solutions:
Energy Centre Controls design, Commissioning, Remote Monitoring
Services:
Controls, Commissioning and RM
Sectors:
Building Services
New City Hall - The Crystal
New City Hall - The Crystal
Completion:
December 2021
Location:
London
Client:
EDGE DBS
Solutions:
Energy Centre Controls Upgrade (Tridium)
Services:
Controls Upgrade – Commissioning - System Optimisation
Sectors:
Building Services
Crown Point
Crown Point
Completion:
December 2021
Location:
Norwich
Client:
ESB
Solutions:
Develop controls logic, commissioning, remote monitoring, data acquisition & performance reporting
Services:
Controls, Commissioning & Optimisation
Sectors:
Agriculture