The Challenge

Heartlands Hospital required a complete controls software development and commissioning solution for their new energy centre. The project demanded specification and programming of a Jace 8000 controller with associated Niagara N4 control software, developed to match the designer's control philosophy and aligned with electrical and mechanical drawings for a water source heat pump (WSHP) and combined air-handling unit system. The control strategy needed to be thoroughly tested before on-site deployment, and the entire system commissioned with full integration and handover.

What We Delivered

Link Energy developed a complete Niagara 4 controls solution covering software design, Description of Operation, bench testing and full system commissioning across both off-site and on-site phases.

Software Development & Des-Ops:

  • Full Tridium Niagara N4 control strategy software developed from design documentation and control philosophy
  • Comprehensive I/O points list and communications network register generated to match electrical schematics
  • Description of Operation prepared in line with the designer's requirements and refined following design team review
  • Control strategy logic meetings held to validate approach and incorporate design feedback
  • Control strategy and Des-Ops updated and finalised following technical review

Bench Testing & Configuration:

  • Jace 8000 controller sized and specified for the application
  • COM port configuration completed and verified
  • I/O point and network configuration tested to electrical schematics
  • Equipment points, circulation pump, heat meter and electricity meter networks configured and tested
  • Control strategy functional testing completed by section to verify logic operation
  • Graphical HMI/PX display produced as a visual representation of the system
  • History and alarm extensions configured (with notes on remote connection requirements for data storage and monitoring)
  • Pre-commissioning documentation prepared

Off-Site Commissioning:

  • Control wiring installation reviews to verify terminations and network topology good practice
  • Main Jace 8000 controller commissioning and integration
  • I/O commissioning and verification
  • Network commissioning (where temporary power supply available)
  • Point-to-point termination checks completed
  • Temperature sensor initialisation and verification

On-Site Commissioning:

  • System flow rate verification to design parameters
  • Control functionality verification against Description of Operation
  • BMS integration and interface testing
  • Final temperature sensor calibration and accuracy verification
  • Final equipment commissioning and operational checks
  • Completion of all commissioning paperwork and compliance documentation
  • Formal system demonstration and handover to Heartlands Hospital representatives

Results

Complete Software Solution: Fully developed Niagara N4 control strategy with comprehensive Des-Ops aligned with design philosophy and electrical specifications

Thoroughly Tested: Bench testing completed prior to site deployment, ensuring COM, I/O, network and logic functionality verified

System Integration: Jace 8000 fully commissioned with BMS integration, sensor calibration and equipment verification on site

Client Handover: Formal handover with graphical HMI, commissioning documentation and operational training completed

Ready for Operation: System operational and aligned with design performance targets

Link Energy Engineer
Available Now Response within 24h

Get in touch

Ready to optimise
your energy systems?

Talk to our engineers about PPM contracts, remote monitoring, commissioning, or any energy management challenge you're facing.