Kings' Mill Hospital
Controls Integration
Kingsmill Hospital required a major controls upgrade to its heat pump energy centre. The existing panel's age and limitations risked unreliable heating/cooling delivery and lacked modern monitoring capability. Precise decommissioning and complex commissioning were essential to keep heat pumps and circulation pumps running manually before handing over a fully automated, connected system.
✓ Safe Changeover: Seamless migration from legacy to new EnMS panel, zero system downtime
✓ Operational Assurance: Comprehensive testing and commissioning guarantee reliable HVAC performance
✓ Visibility: Remote-access dashboard for live system monitoring and downloadable data
✓ Trackable Delivery: Transparent payment milestones aligned with delivery, installation, and final acceptance
✓ Compliance: Hardware and installation to up-to-date technical and regulatory standards